Straits Area Snowmobile Club Forums
 

Go Back   Straits Area Snowmobile Club Forums > Summer Fun and Info > ATVs, ORVs & Boats
FAQ Members List Calendar Search Today's Posts Mark Forums Read

ATVs, ORVs & Boats Discussion of your summer toys here.

Reply
 
Thread Tools Display Modes
Old 06-12-2017, 01:45 PM   #1
Snow VP
Administrator
 
Snow VP's Avatar
 
Join Date: Oct 2005
Location: St. Ignace
Posts: 2,798
Default Bridge Replacement

Finally getting the tippy bridge replaced. Trail closed between Brevort & Cut River:

June 9, 2017
Contact: Paul Gaberdiel, 906-235-9650
Replacement project to close bridge that services Prout Road and Snowmobile Trail No. 473

The Michigan Department of Natural Resources today announced that the bridge that services both State Forest Prout Road and Snowmobile Trail No. 473, which is used by a multitude of forest users throughout the summer, will be closed for replacement beginning today. The bridge provides access over a feeder stream to the Cut River, located at T42N, R6W, Section 6, in Mackinac County. The new structure is estimated to open in mid-July.
The current bridge structure has been deteriorating and has caused ongoing erosion into the stream. The new structure will be safer for users and reduce sedimentation into the stream. During the project, users can utilize Cut River Road as an alternate route.
Grant funding from the Recreation Trail Program, ORV Trail Improvement Fund and Snowmobile Trail Improvement Fund was used for this project. Funds derived from the sale of ORV and snowmobile licenses and permits are reinvested back into their respective programs through a grant program.
Visit www.michigan.gov/dnrclosures to learn about additional closures and trail detours in DNR facilities, including state trails, boat launches, parks and campgrounds. Information on intermittent closures may not be posted.
For more information, contact Paul Gaberdiel, recreation trails specialist for the DNR, at 906-235-9650 or gaberdielp@michigan.gov or visit www.michigan.gov/dnrtrails.
/Editor's note: An accompanying map is available below for download./
ProutRoadClosure.map.jpg
__________________
-- Neil
VP Straits Area Snowmobile Club
Snow VP is offline   Reply With Quote
Old 06-25-2017, 09:35 PM   #2
ToddMeister
the Bay City Roller
 
ToddMeister's Avatar
 
Join Date: Dec 2005
Location: Bay City, MI
Posts: 1,403
Thumbs up Re: Bridge Replacement

Whew finally going to replace dat bridge!!!

What are they replacing the old boxcar with?
__________________
2016 Yamaha SR Viper LTX LE Turbo
2012 Yamaha RS Vector LTX
2009 Yamaha Grizzly 700 FI EPS SE
Member of:
Straits Area Snowmobile Club
M.S.A.
ToddMeister is offline   Reply With Quote
Old 07-18-2017, 04:41 PM   #3
Snow VP
Administrator
 
Snow VP's Avatar
 
Join Date: Oct 2005
Location: St. Ignace
Posts: 2,798
Default Re: Bridge Replacement

They were going to use one of those temporary bridges that have been used successfully around. Except, I did the research, and for within 10% of the same cost, recommended that they install a concrete box culvert, with gravel road overtop. Next winter, you will probably only see a short section of guardrail along there - no more bridge to worry about.
__________________
-- Neil
VP Straits Area Snowmobile Club
Snow VP is offline   Reply With Quote
Old 07-23-2017, 10:58 AM   #4
Wink
Trail Master
 
Wink's Avatar
 
Join Date: Jan 2006
Location: Celina, OH
Posts: 1,388
Default Re: Bridge Replacement

You need a couple of these. Outside dimensions 14 wide, 6 high, 4 front to back. 23,000 lbs. each. We're doing a job that is using 158 of these. Culvert is 700 ft. long. Using a BIG excavator to set them.
Attached Images
File Type: jpg image.jpg (54.0 KB, 46 views)
__________________
Member:
Straits Area Snowmobile Club
MSA


"Do the right thing because it's the right thing to do!"


Wink is online now   Reply With Quote
Old 07-24-2017, 01:13 PM   #5
Snow VP
Administrator
 
Snow VP's Avatar
 
Join Date: Oct 2005
Location: St. Ignace
Posts: 2,798
Default Re: Bridge Replacement

same idea, open natural bottom for the fish.
__________________
-- Neil
VP Straits Area Snowmobile Club
Snow VP is offline   Reply With Quote
Old 07-24-2017, 06:28 PM   #6
Snow VP
Administrator
 
Snow VP's Avatar
 
Join Date: Oct 2005
Location: St. Ignace
Posts: 2,798
Default Re: Bridge Replacement

Haven't heard from DNR yet, but I guess they are all done.

Looks like they went with a small width then I thought they were. Guess the engineer knows what he is doing.

Bobby was pretty excited to see today and sent these pics in
Attached Images
File Type: jpg imagejpeg_c.jpg (78.1 KB, 42 views)
File Type: jpg imagejpeg_b.jpg (59.1 KB, 40 views)
File Type: jpg imagejpeg_0.jpg (74.1 KB, 41 views)
File Type: jpg imagejpeg_a.jpg (73.5 KB, 42 views)
__________________
-- Neil
VP Straits Area Snowmobile Club
Snow VP is offline   Reply With Quote
Old 07-25-2017, 07:04 PM   #7
Go Fast or Go Home
Trail Master
 
Join Date: Feb 2011
Location: White Pigeon, Mi 49099
Posts: 149
Default Re: Bridge Replacement

Thanks for the updates and photos

Don~
Go Fast or Go Home is offline   Reply With Quote
Old 07-28-2017, 10:48 PM   #8
ToddMeister
the Bay City Roller
 
ToddMeister's Avatar
 
Join Date: Dec 2005
Location: Bay City, MI
Posts: 1,403
Thumbs up Re: Bridge Replacement

Looks good, thanks for the update...
__________________
2016 Yamaha SR Viper LTX LE Turbo
2012 Yamaha RS Vector LTX
2009 Yamaha Grizzly 700 FI EPS SE
Member of:
Straits Area Snowmobile Club
M.S.A.
ToddMeister is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -4. The time now is 09:16 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright ? 2016 - Straits Area Snowmobile Club